STANDARDS The capacitor unit furnished shall be designed, fabricated, tested, and delivered in accordance with; Power Capacitor Unit Specification 26 35 33.13.01 The Pole Mounted System shall be designed, fabricated, tested, and delivered in accordance with; ANSI C57.12.29 ANSI C57.12.31 Products General
3.1 The construction of the pipelines and ancillary shall be suitable for continuous operations under high ambient temperatures and humidity. The atmosphere at the Facility is generally dusty and corrosive and may contain traces of hydrogen sulphide.
All capacitor units, switches, and accessories shall be factory mounted to the bank. Any items not mounted at factory shall be indicated on proposal and submittals. The Capacitor bank shall have proper electrical clearances for [95kV BIL] [125kV BIL] [150kV BIL] [Other]. The capacitor bank frame shall be an “inline” type.
Pipeline initiation, installation and termination; 2. Anchor patterns and handling; 3. Stinger profiles and roller settings; 4. Abandonment and recovery (A/R), 5. Actual suspended pipe configuration and location of the touchdown point; 6. Piggyback pipeline installation; 7.
The pole mounting plate shall allow for mounting of the bank to either round wooded pole or concrete square poles. Capacitor bank shall be provided with legs which allow the capacitor bank (with all accessories installed) to sit level on the ground. The Capacitor bank shall be fitted with 4 lifting eyes which will provide level lifting
For pipeline initiation and termination target area requirements refer to Section 11.11. 11.2.1 Vessel Positioning and Survey Positioning and survey operations and systems for the pipe lay spread shall be accordance with BZOF-PL-SPC-00013 and BZOF-PL-SPC-00006.
Film Capacitors – Power Factor Correction
Read the following »Installation and Maintenance Instructions« carefully before installing a capacitor into your application. The information stated in this manual applies to typical, approved usage. Please refer to our product specifications, or request our approval for your own individual specifications, before installing capacitors.
CANADIAN NATURAL RESOURCES PIPELINE SPECIFICATIONS …
territory of installation as well as the Government of Canada. 1.1.3 In the event of a conflict between this specification and any other governing legislation, regulation, code or standard the Company must be consulted and the specification
Specification for Offshore Pipeline Installation20191127 16634 173hvno
CONTRACTOR documents and procedures shall be based on the above and provide a well-defined process to execute a safe, high quality, efficient, timely, and cost-managed offshore pipeline installation that will achieve the overall project objectives and ensure pipeline integrity for the operational life. 2.2 Scope of Work 2.2.1 This Specificat...
Specification for Offshore Pipeline Installation20191127 16634 …
CONTRACTOR documents and procedures shall be based on the above and provide a well-defined process to execute a safe, high quality, efficient, timely, and cost …
ITP For Offshore Pipeline Installation Rev A | PDF
This document provides an inspection and test plan (ITP) for offshore pipeline installation for the KLD Field Development Project. It includes 8 pages outlining the project scope, definitions, objectives, abbreviations, inspection levels, …
Microsoft Word
Procedures for off-loading, storage, recieving, control, traceability and inspection of piping material supplied for fabrication and installation shall be worked out. In general, the following …
GE HIGH VOLTAGE
Install capacitors to reduce the reactive power demand (kilovar) from point of generation to point of use. Bring voltage and current closer to being in phase. High voltage capacitors are used in equipment made to improve Power Factor, and provide voltage /VAR support.
DESIGN AND CONSTRUCTION STANDARD SPECIFICATIONS
SPECIFICATIONS . Pipeline Occupancies . OFFICE OF: VICE PRESIDENT - ENGINEERING . JACKSONVILLE, FLORIDA . ISSUED: September 15, 2003 . REVISED: June 5, 2018 . THIS PAGE BLANK . DESIGN & CONSTRUCTION STANDARD SPECIFICATIONS – PIPELINE OCCUPANCIES TABLE OF CONTENTS Issued: 9/15/2003 Revised: 6/5/2018 …
Microsoft Word
Procedures for off-loading, storage, recieving, control, traceability and inspection of piping material supplied for fabrication and installation shall be worked out. In general, the following applies: carbon steel and stainless steel components …
PROJECT STANDARDS AND SPECIFICATIONS pipeline …
Pipeline Construction (PROJECT STANDARDS AND SPECIFICATIONS) Page 3 of 34 Rev: 1 Feb 2018 1.0 SCOPE 1.1 This document covers the minimum requirements the Contractor shall consider in supply of materials and the construction of the pipelines and ancillary facilities for installation at the Facility.
Design and Installation of Galvanic-Anode, Impressed
Electrical energy can be introduced onto the pipeline three different ways, 1) conductive coupling during fault conditions, 2) electromagnetic/inductive coupling, and 3) electrostatic/capacitive coupling.
UP: Pipeline Engineering Specs
Pipeline Installation Engineering Specifications. Specifications for Pipelines with Maximum Casing Diameter Of 48 Inches and Encased Gas Transmission Lines Crossing Under Railroad Tracks . For Flammable Substances. Scope Pipelines included under these specifications are those installed to carry oil, gas, gasoline, or other Flammable or highly volatile substances. …
GE HIGH VOLTAGE
Install capacitors to reduce the reactive power demand (kilovar) from point of generation to point of use. Bring voltage and current closer to being in phase. High voltage capacitors are used in …
43-SDMS-01 SPECIFICATIONS FOR
This SEC Distribution Materials Specification (SDMS) specifies the minimum technical requirements for design, engineering, manufacture, inspection, testing and performance requirements of outdoor fixed/switched shunt capacitor bank, three-phase, intended to be …
INDIANA-AMERICAN WATER PIPELINE SPECIFICATIONS …
PIPELINE SPECIFICATIONS . NOVEMBER-2019 . TECHNICAL SPECIFICATIONS- 2019 . TABLE OF CONTENTS DIVISION 1 – GENERAL REQUIREMENTS 01000 - Summary of Work 01010 - Drawing Index . 01011 - Special . Provisions . 01075 - Basis of Payment 01300 - Submittals . 01500 - Temporary Facilities 01570 - Traffic Regulation . 01600 - Products 01700 …
General Specification: NO. 30-5-1 Offshore Pipelines Installation
GS 30-5-1.pdf - Free download as PDF File (.pdf), Text File (.txt) or read online for free. The document provides specifications for offshore pipeline installation ...
PROJECT STANDARDS AND SPECIFICATIONS pipeline construction …
Pipeline Construction (PROJECT STANDARDS AND SPECIFICATIONS) Page 3 of 34 Rev: 1 Feb 2018 1.0 SCOPE 1.1 This document covers the minimum requirements the Contractor …
Method Statement for Capacitor Banks Installation
This article aims to provide a detailed guide on the method statement for capacitor banks installation, covering various subtopics such as scope, materials, applicable locations, storage, installation procedures, safety measures, record-keeping, and attachments.
Slide 1
%PDF-1.6 %âãÏÓ 1700 0 obj > endobj 1721 0 obj >/Filter/FlateDecode/ID[6D86CBF70A0AF24299A128197EB449C0>]/Index[1700 36]/Info 1699 0 R/Length 107/Prev 5710510/Root ...
Medium-voltage, single-phase capacitor installation and ...
INSTALLATION AND MAINTENANCE INSTRUCTIONS MN230002EN December 2016 2 Installation 1. De-energize the circuit. 2. Install the rack or frame in which the capacitors are to …
POLE MOUNTED CAPACITOR BANKS
The pole mounted capacitor bank frame shall be provided to mount the capacitor units, switches, transformers etc., as defined in this specification. The frame shall be constructed of material using lightweight all aluminum (ASTM 6061-T6) material. The capacitor bank shall include the …
SPECIFICATION GUIDELINE FOR PIPELINE
specifications, while similar, accomplish two different purposes and have very different implementation requirements and performance expectations. These two specifications are: • Section 33 01 30.61 – Pipeline Packer Injection Capital Grouting • Section 33 01 30.61t – Pipeline Packer Injection Pre-Rehabilitation Grouting
Film Capacitors – Power Factor Correction
Read the following »Installation and Maintenance Instructions« carefully before installing a capacitor into your application. The information stated in this manual applies to typical, …
43-SDMS-01 SPECIFICATIONS FOR
This SEC Distribution Materials Specification (SDMS) specifies the minimum technical requirements for design, engineering, manufacture, inspection, testing and performance requirements of outdoor fixed/switched shunt capacitor bank, three-phase, intended to be used for the MV overhead distribution system of Saudi Electricity Company (SEC) in Sau...
Medium-voltage, single-phase capacitor installation and ...
INSTALLATION AND MAINTENANCE INSTRUCTIONS MN230002EN December 2016 2 Installation 1. De-energize the circuit. 2. Install the rack or frame in which the capacitors are to be mounted. 3. Hoist each capacitor into position in the rack or frame using the capacitor''s hanger brackets. CAUTION It is important to use a properly sized conductor with
Technical Specification for Pipeline Construction:
Engineers and pipeline owners routinely recycle their favourite Technical Specification for Pipeline Construction each time it is required for a new pipeline project. These "˜favourite'' specifications include sections on each aspect of pipeline construction, including welding and non-destructive testing. Many years ago when the engineering, and in some …
Pipeline Basics & Specifics About Natural Gas Pipelines
%PDF-1.4 %âãÏÓ 300 0 obj > endobj xref 300 74 0000000016 00000 n 0000002739 00000 n 0000002902 00000 n 0000003400 00000 n 0000003912 00000 n 0000004301 00000 n 0000004386 00000 n 0000004972 00000 n 0000005418 00000 n 0000006079 00000 n 0000006665 00000 n 0000006779 00000 n 0000006891 00000 n 0000007010 00000 n …
POLE MOUNTED CAPACITOR BANKS
The pole mounted capacitor bank frame shall be provided to mount the capacitor units, switches, transformers etc., as defined in this specification. The frame shall be constructed of material …
Method Statement for Capacitor Banks Installation
This article aims to provide a detailed guide on the method statement for capacitor banks installation, covering various subtopics such as scope, materials, applicable locations, storage, …
Design and Installation of Galvanic-Anode, Impressed
Electrical energy can be introduced onto the pipeline three different ways, 1) conductive coupling during fault conditions, 2) electromagnetic/inductive coupling, and 3) electrostatic/capacitive …